Cedar Road North Extension: 6th Street to Enoch Road
J-U-B Engineers
Deer Park, WA
This Contract provides construction of Cedar Road from the intersection of 6th Street to Enoch Road. The project includes construction of road, sidewalk, curb and gutter, stormwater improvements, sewer line construction and water line construction, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
11/19/20 2:00 pm
Town of Latah Well No. 2 Rehabilitation
J-U-B Engineers
Latah, WA
The project generally consists of work to rehabilitate Well No. 2, including replacement of pump and motor, electrical equipment and controls, electrical improvements, emergency power plug, well level transducer, and telemetry improvements to communicate with the control panel for Well No. 1, and other associated items of work.
Bidding Closed
11/23/20 2:00 pm
City of Deer Park Crawford/Colville Roundabout And N Colville Reconstruction
J-U-B Engineers
Deer Park, WA
This contract provides construction of a new roundabout at the intersection of Crawford Avenue and Colville Road, and reconstruction of Colville Road north from Crawford Ave. to 3rd Street, including roadway, curb, gutter, sidewalk, stormwater facilities, waterline replacement, and sewer replacement in addition to other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
11/5/20 2:00 pm
City of Deer Park 6th Street Reservoir Replacement
J-U-B Engineers
Deer Park, WA
Base Bid: Construction of a 600,000 gallon composite concrete and steel elevated reservoir with associated water line and site work, including disconnection of the existing steel standpipe reservoir adjacent to the proposed reservoir site. The project also includes rehabilitation of the existing electrical panel and replacement of the level transducer at the Crawford Street Reservoir.
Bidding Closed
10/28/20 8:30 am
Worley Highway District - Finnebott/Sun Up Bay/Bennion Intersection
J-U-B Engineers
Kootenai County
This project bid includes construction of the first phase (phase 1) of a 2-phase project. Phase 1 reconstructs the Finnebott Road and Bennion Road intersection. Phase 2, which is not included in this bid but shown in the project plans reconstructs the Sun Up Bay Road and Bennion Road Intersection. The project includes, but is not limited to, traffic control, temporary and permanent erosion control, site clearing, excavation including soil processing and rock excavation, embankment construction, roadway ballast, base and asphalt construction, signing, and pavement markings. Excavated soil and rock from Phase 1 will be used to construct embankments associated with the future Phase 2 project. The project is located within Indian lands of the Coeur d’ Alene Tribe and is subject to Tribal Employment Rights Ordinances (TERO) governing employment practices and taxes levied on all CONTRACTORS and SUBCONTRACTORS working on Tribal lands.
Bidding Closed
10/13/20 2:00 pm
Generator Addition
AEI Engineering, Inc.
Lewiston, ID
Addition of one 480Y/277V generator, stand-by power switchboard, step-up transformer, 480V automatic transfer switch, utility revisions and motor control system revisions.
Bidding Closed
9/17/20 2:00 pm
Waterville Airport 2020 Pavement Rehabilitation Project
J-U-B Engineers
Waterville, WA
The project generally consists of work to crack seal, slurry seal and mark the runway, taxiway and apron areas. The project will also include existing pavement marking removal and isolated patching.
Bidding Closed
9/4/20 2:00 pm
Spokane Street & Prairie Avenue - Post Falls
J-U-B Engineers
Post Falls
Project Summary: The phase 1 work includes roadway construction at Spokane Street and the railroad crossing south of Prairie Avenue in Post Falls, Idaho. Work will include construction of curb, gutter, sidewalk, paved trail, and drainage infrastructure.
Bidding Closed
7/16/20 2:00 pm
2020 Sewer Trunk Line Replacement
J-U-B Engineers
Weippe, ID
The Project generally consists of replacing approximately 2,013 linear feet of 12-inch and 15-inch sanitary sewer pipeline with 15-inch sanitary sewer pipeline. Replacing sanitary sewer pipe includes sewer by-pass pumping, cleaning, CCTV inspection, reinstating laterals, testing, and other miscellaneous and related items of work.
Bidding Closed
6/23/20 3:00 pm
2020 CIPP Project
J-U-B Engineers
Lewiston, ID
The Lewiston Orchards Sewer District (District) in Lewiston, Idaho is requesting Statements of Qualifications (SOQ) from licensed public works contractors who are interested in bidding on the 2020 CIPP Project. The Project generally consists of two schedules of cured-in-place pipe {CIPP) rehabilitation including sewer by-pass pumping, cleaning, CCTV inspection, cutting off protruding taps, reinstating laterals, testing, and other miscellaneous and related items of work. Schedule A consists of approximately 3,907 linear feet of 15-inch and 906 linear feet of 18-inch sanitary sewer pipe. Schedule B consists of approximately 850 linear feet of 18-inch sanitary sewer pipe.