Sandpoint Airport Boyer Road Relocation

The project consists of, but is not limited to, relocating approximately 600 LF of Boyer Road to move the paved roadway surface beyond the Runway Object Free Area (ROFA) of the Sandpoint Airport. Associated work elements include approximately 260 LF of airport perimeter fencing along the edge of the ROFA, relocation of approximately 400 LF of trail along the east side of Boyer Road, relocation of the existing trail crossing signing, and construction of a retaining wall along approximately 160 LF of the easterly Boyer Road Right-of-Way (ROW).
  Addendum #1 (click to expand/collapse)
Name Size
Addendum No. 1 5-2021 (Signed) 258.1 KB
  Electronic Design Media (click to expand/collapse)
Name Size
Electronic Design Media.zip 32.4 MB