City of Bonners Ferry - Moyie Dam Concrete Rehabilitation Project

The project consists of the following: Rehabilitating the downstream concrete surface of the Moyie Dam including the west and east spillways and dam face. Project includes but is not limited to, erosion/sediment control and mitigation, hydro­demolition, concrete doweling, concrete reinforcement, shotcrete, cast-in-place concrete, development of a work plan for staging and access and adherence to the quality control inspection plan for the project. The project is anticipated to span multiple years and the Base Bid includes 3 schedules for the rehabilitation identified in the plans.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
Cover and Table of Contents 240.0 KB
Section 1-A - Bid Forms 3.3 MB
Section 1-B - Contract Forms 4.0 MB
Section 2 - General Conditions 1.0 MB
Section 3 - Supplementary Conditions 475.7 KB
Section 4 - Tehcnical Specifications 7.4 MB
Section 5 - Special Provisions 1.5 MB
Section 6 - Appendix A - Draft Quality Control Inspection Plan (QCIP) 4.7 MB