City of Bonners Ferry - Moyie Dam Concrete Rehabilitation Project
The project consists of the following: Rehabilitating the downstream concrete surface of the Moyie Dam including the west and east spillways and dam face. Project includes but is not limited to, erosion/sediment control and mitigation, hydrodemolition, concrete doweling, concrete reinforcement, shotcrete, cast-in-place concrete, development of a work plan for staging and access and adherence to the quality control inspection plan for the project. The project is anticipated to span multiple years and the Base Bid includes 3 schedules for the rehabilitation identified in the plans.
Status
Bidding Closed
Prebid Date12/16/20 10:00 am
Bid Date1/27/21 2:00 pm
Company & Contacts
J-U-B Engineers
Angela Comstock acomstock@jub.com
(208) 762-8787
Location
Bonners Ferry, ID
Project Estimate: $3,250,000 to $3,750,000
Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.
A pre-bid conference will be held on site at 10:00 am local time, December 16, 2020.