City of Bonners Ferry - Moyie Dam Concrete Rehabilitation Project

The project consists of the following: Rehabilitating the downstream concrete surface of the Moyie Dam including the west and east spillways and dam face. Project includes but is not limited to, erosion/sediment control and mitigation, hydro­demolition, concrete doweling, concrete reinforcement, shotcrete, cast-in-place concrete, development of a work plan for staging and access and adherence to the quality control inspection plan for the project. The project is anticipated to span multiple years and the Base Bid includes 3 schedules for the rehabilitation identified in the plans.
  1947 Plans and Photos (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2017 Moyie Hydro Photos.pptx 31.1 MB
moyiedam 47 sh01 2.4 MB
moyiedam 47 sh02 1.8 MB
moyiedam 47 sh03 2.3 MB
moyiedam 47 sh04 3.0 MB
moyiedam 47 sh05 3.5 MB
moyiedam 47 sh06 1.9 MB
moyiedam 47 sh07 3.2 MB
moyiedam 47 sh08 4.4 MB
moyiedam 47 sh09 2.8 MB
moyiedam 47 sh10 1.8 MB
moyiedam 47 sh11 1.8 MB
moyiedam 47 sh12 1.6 MB
moyiedam 47 sh13 1.4 MB
moyiedam 47 sh14 4.1 MB
  Addendum #1 (click to expand/collapse)
Name Size
MOYIE DAM CONCRETE REHAB_ADD.1_11DEC2020 218.5 KB
  Addendum #2 (click to expand/collapse)
Name Size
MOYIE DAM CONCRETE REHAB_ADD.2_22DEC2020 1.8 MB
  Addendum #3 (click to expand/collapse)
Name Size
MOYIE DAM CONCRETE REHAB_ADD.3_06JAN2021 212.5 KB
  Addendum #4 (click to expand/collapse)
Name Size
MOYIE DAM CONCRETE REHAB_ADD.4_11Jan21 271.5 KB
  Addendum #5 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
MOYIE DAM CONCRETE REHAB_ADD.5_21Jan21 240.9 KB
MoyieDamDraftSurfaceAreaCalculations 128.7 KB