Worley Highway District - Finnebott/Sun Up Bay/Bennion Intersection

This project bid includes construction of the first phase (phase 1) of a 2-phase project. Phase 1 reconstructs the Finnebott Road and Bennion Road intersection. Phase 2, which is not included in this bid but shown in the project plans reconstructs the Sun Up Bay Road and Bennion Road Intersection. The project includes, but is not limited to, traffic control, temporary and permanent erosion control, site clearing, excavation including soil processing and rock excavation, embankment construction, roadway ballast, base and asphalt construction, signing, and pavement markings. Excavated soil and rock from Phase 1 will be used to construct embankments associated with the future Phase 2 project. The project is located within Indian lands of the Coeur d’ Alene Tribe and is subject to Tribal Employment Rights Ordinances (TERO) governing employment practices and taxes levied on all CONTRACTORS and SUBCONTRACTORS working on Tribal lands.
  Addendum #1 (click to expand/collapse)
Name Size
SUNUP-PH1_ADD.1_25SEPT2020 462.1 KB
  Addendum #2 (click to expand/collapse)
Name Size
SUNUP-PH1_ADD.2_01OCT2020 3.0 MB
  Addendum #3 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
20-16-045_C-DATA_Datum.xml 838.1 KB
20-16-045_C-DATA_Top Surface.xml 715.7 KB
20-16-045_C-SP-PH1.dwg 2.2 MB
20-16-045_C-SP-PH2.dwg 1.7 MB
20-16-045_V-PB.dwg 2.1 MB
20-16-045_V-SP.dwg 2.2 MB
20-16-045_V-SP_EG.xml 227.8 KB
SUNUP-PH1_ADD.3_07OCT2020 534.1 KB
  Addendum #4 (click to expand/collapse)
Name Size
SUNUP-PH1_ADD.4_09OCT2020 2.0 MB
  Addendum #5 (click to expand/collapse)
Name Size
SUNUP-PH1_ADD.5_13OCT2020_REV1 462.3 KB
  Addendum #6 (click to expand/collapse)
Name Size
SUNUP-PH1_ADD.6_23OCT2020_REV1 1.2 MB